AGRI Park Rail Yard And Connectivity From DHRUB Station

Client: Adani Ports and Special Economic Zone Ltd

Location: Mundra

Adani group delegated responsibility of project management consultancy to HOWE from concept to commissioning. The broad scope of HOWE includes from planning, engineering, estimation, commercial aspects, quality, construction supervision at site etc. The scope of HOWE also included obtaining all necessary clearances for the respective railway and other authorities.

Salient Features
Project Cost 16.03 Cr.
Total Track Length of siding 9.10 Kms.
Track Gauge Broad Gauge – 1676mm.
Ruling Gradients 1 in 1000 (Compensated)
Gradients in station Yard 1 in 1200
Rails 52Kg – First / Second Quality
Sleepers PSC Sleepers
Ballast Cushion 300mm
Formation Width 6.85m in embankment & 6.25m in cutting
Welding of Rails Short Welded – 3 Rail Panels
Welding of Rails Short Welded – 3 Rail Panels
Points & Crossings 1 in 81/2 with Curved Switches
Design Speed in Section 100 Kmph (Max.), 75 Kmph
Curves 2 Nos. 6 Degree Curves
Cargo Handling Agri based Cargo from Mundra Port
Period of Construction 4 Months
Level Crossings Two Number(unmanned)
Earthwork involved 80,000Cum in Filling & 30,000Cum in Cutting
Materials Consumed
Rails (52Kg-1st Quality) 960 MT
PSC Sleepers 13200 Nos.
1 in 81/2 Points & Crossings 19 Sets
Structural steel ISMC150 110 MT
Rails (52Kg –IU Quality) 55 MT
In-Motion Weigh Bridge (100MT) 2 Nos.